News
-
From First Article To Full Production: 100 Parts, 8 Hours And 10 Days
2026/10/31Learn how a cleaning process is validated from first article to production: 100 consecutive parts, 8 hours of loaded running and 10 days of daily sampling.
Read More -
Burrs Are Contamination: Why Deburring And Cleaning Share One 78-Second Cycle
2026/10/30Understand why burrs are a contamination source rather than a finish problem, and how a single 78-second cell handles deburring and cleaning without re-contamination.
Read More -
Deep Learning Or Rule-Based Vision: 3,000 Images And 10 Minutes
2026/10/29Learn where rule-based vision still beats deep learning, where it breaks down, and how 3,000 images can be generated in 10 minutes instead of 20 days.
Read More -
Borescope Or Laser Rotary Probe? Inside-Hole Inspection At Ø1.5 mm
2026/10/28Compare borescope optics and laser rotary probes for inside-hole inspection, from a 1.5 mm minimum aperture to detection limits, cycle time and integration.
Read More -
Vacuum Drying For Blind Holes: A 3 ml Moisture Budget
2026/10/27Learn why water stays in blind holes after blowing, how vacuum drying removes it, and how to write a dryness budget in millilitres instead of guessing.
Read More -
Turbulent Flow Cleaning At 1.0 MPa: What It Reaches That A Jet Cannot
2026/10/26Understand what turbulent flow cleaning reaches at 1.0 MPa, where a directed jet still wins, and how to split work between the two stages on a real part.
Read More